LVPS channel assignments for MTCC Phase 2

 

 

 

 

 

 

 

MARATON#1  +YE1

Maraton Channel

Internal

I(A) limit

pin

V(v)

 

Ch1

0

150

1-2

7.5

ME1 D(1/1 27-29,1/2 27-29,1/3 27-29)

Ch2

1

50

10-11

4.5

PC1 +YE1

 

2

 

 

 

 

Ch3

3

100

7-8

7.5

ME1 A(1/1 27-29,1/2 27-29,1/3 27-29)

Ch4

4

150

4-5

7.5

ME1 D(1/1 30-32,1/2 30-32,1/3 30-32)

Ch5

5

50

13-14

6.5

PC1 +YE1

 

6

 

 

 

 

Ch6

7

100

9-12

7.5

ME1 A(1/1 30-32,1/2 30-32,1/3 30-32)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

MARATON#2  +YE2

Maraton Channel

Internal

I(A) limit

pin

V(v)

 

Ch1

0

150

1-2

7.5

ME2 D(2/1 14-16,2/2 27-32)

Ch2

1

50

10-11

4.5

PC1 +YE2

 

2

 

 

 

 

Ch3

3

100

7-8

7.5

ME2 A(2/1 14-16,2/2 27-32)

Ch4

4

150

4-5

7.5

ME3 D(3/1 14-16,3/2 27-32)

Ch5

5

50

13-14

6.5

PC1 +YE2

 

6

 

 

 

 

Ch6

7

100

9-12

7.5

ME3 A(3/1 14-16,3/2 27-32)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

MARATON#3  +YE2

Maraton Channel

Internal

I(A) limit

pin

V(v)

 

Ch1

0

100

15-18

4.5

PC2 +YE1

Ch2

1

100

9-12

 

 

Ch3

2

100

7-8

 

 

Ch4

3

100

16-17

6.5

PC2 +YE1

Ch5

4

100

13-14

4.5

PC2 +YE2

Ch6

5

100

10-11

6.5

PC1 +YE2

 

6

 

 

 

 

 

7

 

 

 

 

V.Sulimov 28.09.06

 

 

 

 

 

 

 

The chambers are connected as for phase 1.

The PC’s have been split and two moved to M3.

The LV cable from M3 to YE+1 will be moved

when we re-close.                    

 

Contact fredob@fnal.gov for changes.