Fred Borcherding

Home Page

 

 

 

Fermilab Staff on US CMS

Based at CERN

 

 

Fermilab  Contact Information:

 

BORCHERDING, FREDERICK O (Fermilab Employee)

PPD-CMS DEPARTMENT

Email: fredob@fnal.gov

 

CERN Contact Information:

 

Frederick BORCHERDING from PH/UCM

ccid: 638797
Tel:74763 (from outside: +41 22 76 74763 )
GSM: 160999 (from outside: +41 76 487 0999 )
Office: 32 4-A05 Mailbox: J20410 < mail drop only, I’m never working there

E-mail: Frederick.Borcherding@cern.ch (more info about valid mail addresses)

Experiment: CMS

Homeinstitute:

Fermi National Accelerator Laboratory (FNAL)

 

 

 


Projects:

 

 

EMDB:  Electronics Management Data Base

General Description >

History >

Present Status >

People >

Stephane Bally

Vadim

Igor

Misha

Links >      

Definition of CSC INB db ‘BAR’ codes

 

_________________________________________________

CSC Shift Training:

General Description > conducted every Monday from 13:00 to 14:30 in the conference room at Pt5.  followed by a walk around in the CMSCR at Pt5.  And finally a OJT session with an experienced shifter at the CSC Shifter Station.

History >

Present Status >

People >

Richard?, Rachel?

Links >      

Top level training slides >

PDF >> https://cms-emu-slicetest.web.cern.ch/cms-emu-slicetest/904/Procedures/ShifterTraining-GlobalRunning.pdf

PPT >> https://cms-emu-slicetest.web.cern.ch/cms-emu-slicetest/904/Procedures/ShifterTraining-GlobalRunning.ppt

Focused training slides – for DCS >

PDF >> https://cms-emu-slicetest.web.cern.ch/cms-emu-slicetest/904/Procedures/ShifterTraining-DCS-new-UI.pdf

PPT >> https://cms-emu-slicetest.web.cern.ch/cms-emu-slicetest/904/Procedures/ShifterTraining-DCS-new-UI.ppt

Focused training slides – for EMU Page1 >

PDF > https://cms-emu-slicetest.web.cern.ch/cms-emu-slicetest/904/Procedures/ShifterTraining-EmuPage1.pdf

PPT > https://cms-emu-slicetest.web.cern.ch/cms-emu-slicetest/904/Procedures/ShifterTraining-EmuPage1.ppt

Focused training slides – for Run Registry and DQM >

PDF > https://cms-emu-slicetest.web.cern.ch/cms-emu-slicetest/904/Procedures/ShifterTraining-RunRegistry.pdf

PPT > https://cms-emu-slicetest.web.cern.ch/cms-emu-slicetest/904/Procedures/ShifterTraining-RunRegistry.ppt

 

Focused training slides – for DCS > https://cms-emu-slicetest.web.cern.ch/cms-emu-slicetest/904/Procedures/ShifterTraining-GlobalRunning.pdf

 

_________________________________________________                                        

Procedures:

General Description >

History >

Present Status >

Links >      

 

_________________________________________________

Run Registry and local DQM:

General Description >

History >

Present Status >

Links >      

 

_________________________________________________

B904:

General Description >

History >

Present Status >

Links >      

 

_________________________________________________

ESSC:

 

_________________________________________________

CSC Safety: Ryan

https://cms-emu-slicetest.web.cern.ch/cms-emu-slicetest/904/Procedures/CSC-SafeOperation.pdf

 

_________________________________________________

Shift Leader:

 

_________________________________________________

Fermilab Shift Liaison: 

 

 

_________________________________________________

Web Directory:

General Description > Directory where all the WEB accessible files are stored

History > The general area was created for web pages for the EMU Slice Test in 2005.  I added sub-directories for information for B904 and over time used these sub-directories for the pCrate work at first ISR, then at B904, then at SX5 and finally in UXC including the commissioning.  Presently these directories are used for operations.

Present Status >   these are the sub-directories

          Data_Bases       Home of the original Ecel based CSC hardware db

          Documentation   Documentation of the various hardware systems

FiberOpticConnections – file for the fiber optic installation in USC and UXC

Layouts-SX5 – the location of equipment in UXC

LVPS – the low voltage power supplies

Manuals

Procedures testing – the procedures for the pCrate testing

Talks – slides from talks

Procedures         Home of the non-Twiki based procedures and Training materials

 

Link >         https://cms-emu-slicetest.web.cern.ch/cms-emu-slicetest/904 - not a directory link yet, you have to go there directly

 

_________________________________________________

Web Pages: 

General Description >

History >

Present Status >

Links >      

EMU Electronics Installation And Commissioning, Home Page > This page has many links to hardware related subjects that remain relevant.  It also has information on how the original hardware commissioning was done at ISR, and then at SC5 and finally in UXC

CSCOperations Twiki > https://twiki.cern.ch/twiki/bin/view/CMS/CSCOperations

CSCelectronics Twiki > https://twiki.cern.ch/twiki/bin/view/CMS/CSCelectronics

CSCOperationsPreparation > https://twiki.cern.ch/twiki/bin/view/CMS/CSCOperationsPreparation

CeoInformation Twiki > https://twiki.cern.ch/twiki/bin/view/CMS/CeoInformation

 

********************************************************

 

                                      Last Edit –  19-March - 2010 –
For Comments ---            Contact Fred at;              fredob@fnal.gov